|
Location – Pikeville, Kentucky
New convention and exposition center included the installation of approximately 630 driven H-piles. Pile sizes included HP12x53 and HP10x42. Most piles had to be predrilled through a shot-rock fill, to allow driving to the designed bearing elevation.
|