|
Location: Louisville, Kentucky
Micropiles were designed and installed to support a warehouse floor slab that was experiencing differential settlement.
Sixty-eight micropiles were constructed through 30 feet of overburden and 10 feet of bedrock.
Restricted by 22 feet of headroom, the 75-ton piles were installed with full-length reinforcing and successfully load tested.
|