Spurlock Station

Location: Maysville, Kentucky

This project involved the installation of over 500, 14 inch H-piles, driven to depths of 130 feet. A high energy hydraulic pile hammer was used to drive the piles to the underlying bedrock. Champion splicers were used to achieve the required pile lengths.