Winship Cancer Institute

Location – Atlanta, Georgia

This project located at Emory University included a permanent tied back drilled-in soldier pile and wood lagging earth retention system. The total support face was approximately 27,000 square feet. Up to three rows of permanent soil anchors were required. The permanent exterior building walls were cast directly against the earth retention system.