|
Location – Indianapolis, Indiana
A new addition to the museum cafeteria and Dinosphere Exhibit included adding a an additional basement level to the existing single basement level structure. Richard Goettle, Inc. installed a system of permanent soil anchors through the existing foundation walls where possible and then permanent soil nailing was required for a polyurethane grouted soil face. The total supported area was approximately 2,000 square feet.
|