© 2016 by Goettle

Created by Juliana Chauncey

I-70 MISSISSIPPI RIVER BRIDGE

(MO DOT)

East St. Louis, Illinois

Project Facts

  • 4 ea. - 10' dia. 120' long drilled shafts with 9.5' dia. rock sockets 14.5' long

  • Shafts drilled with temporary casing and slurry to rock

  • Rock socket diameter of 9'- 6" and 14' - 3" long

Scope

  • Installed 4 drilled shafts for Pier 13 on Illinois side of river

  • 26 week schedule completed on time

1/5

Need A Quote?

(513) 825-8100

Questions, Pricing, More Information