© 2020 by Goettle

Duke Energy Office Building

Duke Energy

Bedford, IN

Project Facts

  • 12, 7" diameter micropiles
  • Average length - 40'
  • 3 located inside existing building
  • Entrance to existing building 3.5'

Project Scope

  • Limited headroom installation of 7" micropiles at 45' long
  • 3 were installed with 12' headroom using a Klemm 701 drill
1/0

Need A Quote?

(513) 825-8100

Questions, Pricing, More Information