PROJECT PROFILE
MarkWest Slug Catcher Wall
West Union, WV
Project completed for:
MarkWest
Project Facts
- Value engineered design - build (soldier pile wall)
- 75 pre-drilled soldier piles
- 115 DCP tie-back anchors
- 25,000 SF of precast concrete lagging panels
- 56' maximum wall height
Scope
- Install 718 LF of permanent rock and soil retention system consisting of soldier piles, precast concret panels, and tie-back anchors
- The wall originally designed as a soil nail wall